A Kansas Backhoe Problem

Question: A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas . The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing..

Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no braking by the driver . . . )

Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.
.
.
.
.
.

Answer: It doesn’t really matter… The point is that the trucking company just bought themselves a bridge.
Hat Tip Steve Carter- An Engineer

Photo of author
Jim Hoft is the founder and editor of The Gateway Pundit, one of the top conservative news outlets in America. Jim was awarded the Reed Irvine Accuracy in Media Award in 2013 and is the proud recipient of the Breitbart Award for Excellence in Online Journalism from the Americans for Prosperity Foundation in May 2016. In 2023, The Gateway Pundit received the Most Trusted Print Media Award at the American Liberty Awards.

You can email Jim Hoft here, and read more of Jim Hoft's articles here.

 

Thanks for sharing!